Elk Basin Gasoline Plant
- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Elk Basin Gasoline Plant: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Elk Basin Gasoline Plant
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 72% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1948
- Net generation, 2025
- 6,297 MWh
- Grid
- 8 kV, 2 kV to PacifiCorp (PACE)
- Location
- Park County, Wyoming
- Operated by
- Contango Oil and Gas
Output
- Gas
Details
Who’s behind it
Interested in this project?
- Technology
- Gas, other source: “Other Gases”
- Age
- 78 years since 1948
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 380,100 |
| Capacity factor, 2025 | 0.719 |
| Net generation (MWh), 2025 | 6,297 |
| Balancing authority code | PACE |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 60362.1 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 1.5 MW
- Generators retired
- 2
- Capacity still in service
- 1 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN3 | Other Gases | 0.5 MW | Retired | March 2007 |
| GEN1 | Other Gases | 1 MW | Retired | January 2026 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 8 kV, 2 kV
- Transmission or distribution system owner
- PacifiCorp
- Balancing authority
- PacifiCorp - East
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Contango Oil and Gas | Owner | 64.0% | Dec 31, 2025 | EIA-860 |
| ExxonMobil Oil Corp | Owner | 36.0% | Dec 31, 2025 | EIA-860 |
| Contango Oil and Gas | Operator | EIA-860M |
Timeline
- Stated Unit GEN1 scheduled to retire, 1 MW · EIA-860M
- Stated Unit GEN3 scheduled to retire, 0.5 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Elk Basin Gasoline Plant unit EMGEN Postponed | Gas, reciprocating engine | 0.0 mi | 0.7 |
| Mud Springs Wind Project, LLC Postponed | Wind | 12.7 mi | 80 |
Sources EIA-860M