Show on map
- Combustion
- Loads
- In development
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- In development
- Operating
- Size not stated
Emory Decatur Hospital: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Emory Decatur Hospital
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1991
- Net generation, 2025
- 45 MWh
- Grid
- 14 kV to Georgia Power Co (SOCO)
- Location
- DeKalb County, Georgia
- Operated by
- DeKalb Regional Health SystemSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 35 years since 1991
- Heat rate
- 8,296 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 374 |
| Capacity factor, 2025 | 0.001 |
| Heat rate (Btu/kWh), 2025 | 8,296.4 |
| Net generation (MWh), 2025 | 45.08 |
| Balancing authority code | SOCO |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| DATA CENTER ATLANTA, LLC Built | Large load | 6.1 mi | |
| QUALITY INVESTMENT PROPERTIES METRO, LLC Built | Large load | 7.9 mi | |
| DeKalb County Green Energy Facility Postponed | Biomass | 9.5 mi | 1.6 |
| Leibherr LR 1400 (Atlanta data centre) Filed | Large load | 10.0 mi | |
| TA Reality Ellenwood Data Center Filed | Large load | 10.5 mi | |
| FT GIllem MASE Crane (Forest Park data centre) Filed | Large load | 11.5 mi | |
| TRAVELERS DATA CENTER Built | Large load | 12.5 mi |
Sources EPA ICIS-Air · EIA-860M · FAA OE/AAA