Show on map
Flathead Landfill to Gas Energy Facility — Power plant · Biomass · Flathead Electric Coop Inc
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Flathead Landfill to Gas Energy Facility

Power plant · Biomass

Key facts

Power plant · Biomassran 61% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
17,140 MWh
Grid
12 kV to Flathead Electric Coop Inc (BPAT)
Location
Flathead County, Montana

Operations

Net generation, 2025
17,140MWh
Fuel burned, 2025
162,930MMBtu
Capacity factor, 2025
61.1%
Heat rate, 2025
9,506Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202517,140162,93061.1%9,506
202417,770168,88463.2%9,504
20237,75272,38327.7%9,337
20228,91187,34431.8%9,802
202111,557114,65741.2%9,921
202011,994112,27042.7%9,360
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source