G F Weaton Power Station — Power plant · Coal · Horsehead CorporationMontgomery L&D Hydroelectric Project — Announced · Hydro · PA · 20.4 MW · 2.4 mi awayMontgomery L&D Hydroelectric Project — Postponed · Hydro · PA · 9.5 MW · 2.4 mi awayAligned Data Center Campus — Filed · Large load · PA · 4.0 mi awayDashields Hydroelectric Project — Filed · Hydro · PA · 8.8 MW · 11.0 mi away
  • Combustion
  • Clean firm
  • Loads
  • In development
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

G F Weaton Power Station

Power plant · Coal

Key facts

Power plant · Coalran 46% of 2010 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1958
Net generation, 2010
484,635 MWh
Location
Beaver County, Pennsylvania

Output

Net generation MWh by year, 2001 to 2011
Fuel burned MMBtu by year, 2001 to 2011
  • Gas
  • Coal

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Coal source: “Conventional Steam Coal”
Age
68 years since 1958
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110064089506
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006072
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
September 2012
Capacity retired
120 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Steam Coal60 MWRetiredSeptember 2012
GEN2Conventional Steam Coal60 MWRetiredSeptember 2012

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
HORSEHEAD HOLDING CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Horsehead Corporation Operator EIA-860M

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 120 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Montgomery L&D Hydroelectric Project × 2 units Announced Hydro 2.4 mi 29.9
Aligned Data Center Campus Filed Large load 4.0 mi
Dashields Hydroelectric Project Filed Hydro 11.0 mi 8.8

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026

Attribution