Show on map
Galena 2 Geothermal Power Plant — Power plant · Geothermal · Ormat Nevada Inc
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Galena 2 Geothermal Power Plant

Power plant · Geothermal

Key facts

Power plant · Geothermalran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2007
Net generation, 2025
25,133 MWh
Grid
120 kV to Sierra Pacific Power Co (NEVP)
Location
Washoe County, Nevada
Operated by
Ormat Nevada IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
25,133MWh
Fuel burned, 2025
85,752MMBtu
Capacity factor, 2025
17.4%
Heat rate, 2025
Not stated
Capacity factor % of full output, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
202525,13385,75217.4%—
202436,673125,12925.3%—
202338,097129,98726.4%—
202236,082123,11325.0%—
202135,486313,83924.6%—
202032,091281,34322.1%—
201933,974302,53823.5%—
201831,238284,38921.6%—
201736,656337,71225.4%—
201638,599356,34526.6%—
201543,484405,22830.1%—
201447,276449,59632.7%—
201355,871533,06538.6%—
201266,954637,13246.2%—
201170,789687,78649.0%—
201079,779778,32555.2%—
200983,232812,34457.6%—
200879,342781,83654.7%—
200736,889364,61125.5%—
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

3 sources

Sources EIA-860M · GEM · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution