- Wind & solar
- Under construction
- Retired
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Retired
General Motors Corp at White Marsh MD: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
General Motors Corp at White Marsh MD
Power plant · Solar
Key facts
Power plant · Solar Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2024
- 0 MWh
- Grid
- 0.5 kV to Baltimore Gas & Electric Co (PJM)
- Location
- Baltimore County, Maryland
- Operated by
- Luminace Solar Maryland, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 15 years since 2011
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2021
- Capacity retired
- 1 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 1 MW | Retired | May 2021 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 0 kV
- Transmission or distribution system owner
- Baltimore Gas & Electric Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Transmission lines within 15 mi (10)
- Windy Edge Station - Northeast 115 kV
- Northeast 115 kV line
- Northeast 115 kV line
- Northeast 115 kV line
- Riverside - Northeast 230 kV
- Riverside - Northeast 230 kV
- Northeast - Raphael Road Switching Station 230 kV
- Northeast - Raphael Road Switching Station 230 kV
- Middle River - Northeast 115 kV
- Raphael Road Switching Station 230 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit PV1 scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Marley Neck 3 - SLBAL005 Under construction | Solar | 13.6 mi | 2 |
| Marley Neck 4 - SLBAL006 Under construction | Solar | 13.6 mi | 1.4 |
Sources EIA-860M