Georgia LFG Pine Ridge Plant
Power plant · Biomass
Key facts
Power plant · Biomassran 74% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2016
- Net generation, 2025
- 42,553 MWh
- Grid
- 115 kV to Georgia Power Co (SOCO)
- Location
- Spalding County, Georgia
- Operated by
- Cube District Energy, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 42,553
MWh - Fuel burned, 2025
- 657,085
MMBtu - Capacity factor, 2025
- 73.6
% - Heat rate, 2025
- 15,442
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 42,553 | 657,085 | 73.6% | 15,442 |
| 2024 | 37,066 | 397,021 | 63.9% | 10,711 |
| 2023 | 40,032 | 434,066 | 69.2% | 10,843 |
| 2022 | 34,265 | 346,143 | 59.3% | 10,102 |
| 2021 | 37,977 | 349,348 | 65.7% | 9,199 |
| 2020 | 41,332 | 383,905 | 71.3% | 9,288 |
| 2019 | 46,215 | 393,020 | 79.9% | 8,504 |
| 2018 | 35,298 | 312,162 | 61.1% | 8,844 |
| 2017 | 44,655 | 433,288 | 77.2% | 9,703 |
| 2016 (7 of 12 months) | 17,833 | 147,853 | — | 8,291 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.