Glendale Energy Power Plant
- Bioenergy
- Retired
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Retired
Glendale Energy Power Plant: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Glendale Energy Power Plant
Power plant · Biomass
Key facts
Power plant · Biomass Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2010
- Net generation, 2020
- 0 MWh
- Location
- Maricopa County, Arizona
- Operated by
- Glendale Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2020
- 0
MWh - Fuel burned, 2020
- 0
MMBtu - Capacity factor, 2020
- Not stated
- Heat rate, 2020
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2020 | 0 | 0 | — | — |
| 2019 | 9,396 | 159,063 | 38.3% | 16,929 |
| 2018 | 14,228 | 189,673 | 58.0% | 13,331 |
| 2017 | 19,446 | 249,574 | 79.3% | 12,834 |
| 2016 | 15,475 | 183,728 | 62.9% | 11,873 |
| 2015 | 19,295 | 242,469 | 78.7% | 12,566 |
| 2014 | 16,581 | 195,157 | 67.6% | 11,770 |
| 2013 | 18,161 | 166,672 | 74.0% | 9,178 |
| 2012 | 16,410 | 197,352 | 66.7% | 12,026 |
| 2011 | 17,861 | 207,709 | 72.8% | 11,629 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.