Grand Valley Project Power Plant

Power plant · Hydro

Key facts

Power plant · Hydroran 25% of 2021 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1932
Net generation, 2021
6,649 MWh
Location
Mesa County, Colorado
Operated by
Orchard Mesa Irrigation DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2021

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Hydro source: “Conventional Hydroelectric”
Age
94 years since 1932
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePSCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2021
First unit retired
April 2017
Capacity retired
3 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Conventional Hydroelectric1.5 MWRetiredApril 2017
1Conventional Hydroelectric1.5 MWRetiredOctober 2021

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PSCO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 1.5 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 1.5 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pivot Solar 57 LLC Under construction Solar 6.7 mi 2

Sources EIA-860M