Show on map
Greens Port Industrial Park — Crude oil rail terminalGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 4.8 mi awayTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 5.4 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 5.8 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 8.2 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 10.7 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 11.2 mi awayGCCISD NEW TECHNOLOGY DATA CENTER — Large load · TX · 14.0 mi away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Greens Port Industrial Park

Crude oil rail terminal

Key facts

Crude oil rail terminal Status not stated (what this status means)
Location
Texas

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 6 attributes from EIA US Energy Atlas — Crude Oil Rail Terminals (points; station and facility type, handling; activity 2017-2018)
Attributes
AttributeValue
CityHouston
Padd3
HandlingUnloading
Station typeDestination
Facility typeRefinery
Source release2017_2018

Sources

1 source

Sources EIA Energy Atlas

Sources

  • EIA Energy AtlasOpen license · retrieved Nov 13, 2026Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Rail Terminals (activity 2017-2018)

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Greens Bayou 6 Under construction Gas, combustion turbine 4.8 mi 445
Texas Petrochemicals Postponed Gas, combined cycle 5.4 mi 560
TX Houston 7080 Express Lane Postponed Storage 5.8 mi 1.5
TX LaPort 10060 Porter Road Solar Postponed Solar 8.2 mi 1.6
CPV Pondera King Energy Center Postponed Gas, combined cycle 10.7 mi 900
NET Power La Porte Station Studied Gas, combustion turbine 11.2 mi 25.5
GCCISD NEW TECHNOLOGY DATA CENTER Unknown Large load 14.0 mi

Sources ERCOT · EIA-860M · EPA ICIS-NPDES

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution