Show on map
Guilford - Antrim 138 kV — Transmission lineMason Dixon Solar Center — Postponed · Solar · MD · 20 MW · 4.8 mi awayMaple Ridge A — Under construction · Solar · PA · 3 MW · 6.4 mi awayMaple Ridge B — Under construction · Solar · PA · 3 MW · 6.4 mi awayESS Fairgrounds — Postponed · Battery storage · MD · 4 MW · 8.6 mi awayESS Wesel — Postponed · Battery storage · MD · 6 MW · 9.6 mi awayDownsville II — Under construction · Solar · MD · 2 MW · 13.3 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Guilford - Antrim 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-PA
Owner (as stated)
West Penn Power

Details

Who’s behind it

Owner
West Penn Power
Book a call About these actionsBook a call: our team gets you what you need.

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Guilford to Antrim
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itwest penn power
HIFLD line ID136638
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Mason Dixon Solar Center Postponed Solar 4.8 mi 20
Maple Ridge A Under construction Solar 6.4 mi 3
Maple Ridge B Under construction Solar 6.4 mi 3
ESS Fairgrounds Postponed Battery storage 8.6 mi 4
ESS Wesel Postponed Battery storage 9.6 mi 6
Downsville II Under construction Solar 13.3 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution