Key facts
Power plant · Solarran 21% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2017
- Net generation, 2025
- 93,195 MWh
- Grid
- 230 kV to Florida Power & Light Co (SOCO)
- Location
- Escambia County, Florida
- Operated by
- Arevon Energy, Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 93,195
MWh - Fuel burned, 2025
- 317,980
MMBtu - Capacity factor, 2025
- 21.3
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 67,460 | 230,174 | — | — |
| 2025 | 93,195 | 317,980 | 21.3% | — |
| 2024 | 91,116 | 310,888 | 20.8% | — |
| 2023 | 83,702 | 285,591 | 19.1% | — |
| 2022 | 87,760 | 299,435 | 20.0% | — |
| 2021 | 90,303 | 798,639 | 20.6% | — |
| 2020 | 91,363 | 800,981 | 20.8% | — |
| 2019 | 94,740 | 843,661 | 21.6% | — |
| 2018 | 93,230 | 848,766 | 21.3% | — |
| 2017 (2 of 12 months) | 13,687 | 126,098 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.