Ha Tinh Province solar project IX — Power plant · SolarVung Ang power station Phase 3 Unit 1 — Canceled · Coal · Vietnam · 600 MW · 11.2 km awayVung Ang power station Phase 3 Unit 2 — Canceled · Coal · Vietnam · 600 MW · 11.2 km awayVung Ang power station Phase 3 Unit 3 — Canceled · Coal · Vietnam · 600 MW · 11.2 km awayVung Ang power station Phase 3 Unit 4 — Canceled · Coal · Vietnam · 600 MW · 11.2 km awayVung Ang power station 3-CC1 — Announced · Gas, other · Vietnam · 1,500 MW · 11.2 km awayHa Tinh Formosa Plastics Steel Complex power station Unit 10 — Canceled · Coal · Vietnam · 150 MW · 20.1 km awayHa Tinh Formosa Plastics Steel Complex power station Unit 6 — Canceled · Coal · Vietnam · 150 MW · 20.1 km awayHa Tinh Formosa Plastics Steel Complex power station Unit 7 — Canceled · Coal · Vietnam · 150 MW · 20.1 km awayHa Tinh Formosa Plastics Steel Complex power station 2-1 — Canceled · Gas, other · Vietnam · 600 MW · 20.1 km away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Ha Tinh Province solar project IX

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceGEM tracker rows sourced from TransitionZero (rows carrying a TZ ID), CC BY-NC 4.0 · Non-commercial licenseMW
Commissioned
2021
Location
Ha Tinh Province, Vietnam

Details

Who’s behind it

No companies named in filings yet.

Technology
Solar source: “utility-scale solar / Assumed PV”
Age
5 years since 2021
Units
1
1 attribute from GEM tracker rows sourced from TransitionZero (rows carrying a TZ ID), CC BY-NC 4.0
Attributes
AttributeValue
Gem
Unit ids
G100001077096
Location id
L100001067310
Subnational
Ha Tinh Province
Unit statuses
Operating
1
Location accuracy
exact

Timeline

  • In service · TransitionZero

Sources

1 source

Sources TransitionZero

Sources

  • TransitionZeroNon-commercial license · retrieved Oct 26, 2026TransitionZero, via Global Energy Monitor, CC BY-NC 4.0. Modified by Inframation: statuses and technologies mapped to Inframation's vocabulary. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0).

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Vung Ang power station Phase 3 Unit 1 Canceled Coal 11.2 km 600
Vung Ang power station Phase 3 Unit 2 Canceled Coal 11.2 km 600
Vung Ang power station Phase 3 Unit 3 Canceled Coal 11.2 km 600
Vung Ang power station Phase 3 Unit 4 Canceled Coal 11.2 km 600
Vung Ang power station 3-CC1 Announced Gas, other 11.2 km 1,500
Ha Tinh Formosa Plastics Steel Complex power station Unit 10 Canceled Coal 20.1 km 150
Ha Tinh Formosa Plastics Steel Complex power station Unit 6 Canceled Coal 20.1 km 150
Ha Tinh Formosa Plastics Steel Complex power station Unit 7 Canceled Coal 20.1 km 150
Ha Tinh Formosa Plastics Steel Complex power station 2-1 Canceled Gas, other 20.1 km 600

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution