Harford Waste to Energy Facility
Power plant · Waste to energy
Key facts
Power plant · Waste to energy Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1987
- Net generation, 2015
- 0 MWh
- Location
- Harford County, Maryland
- Operated by
- Energy Recovery Operations, Inc
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
- Technology
- Waste to energy source: “Municipal Solid Waste”
- Age
- 39 years since 1987
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2016
- Capacity retired
- 1.2 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 001 | Municipal Solid Waste | 1.2 MW | Retired | March 2016 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PJM
Transmission lines within 15 mi (10)
- Raphael Road Switching Station 230 kV line
- Raphael Road Switching Station 230 kV line
- Northeast - Raphael Road Switching Station 230 kV
- Raphael Road Switching Station 230 kV line
- Raphael Road Switching Station 230 kV line
- Northeast - Raphael Road Switching Station 230 kV
- Middle River - Northeast 115 kV
- Northeast 115 kV line
- Northeast 115 kV line
- Northeast 115 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| NORTHEAST MARYLAND WASTE DISPOSAL AUTHORITY | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Energy Recovery Operations, Inc | Operator | EIA-860M |
Timeline
- Stated Unit 001 scheduled to retire, 1.2 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory