Show on map
Hartburg - Cypress 500 kV — Transmission lineLumberton PV I, LLC — Announced · Solar · TX · 200 MW · 1.2 mi awayPeri Peri Solar — Postponed · Solar · TX · 115 MW · 8.9 mi away
  • Wind & solar
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hartburg - Cypress 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-TX
Owner (as stated)
Entergy Texas

Details

Who’s behind it

Owner
Entergy Texas

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
32
Substations at the ends (as the source names them)
Hartburg to Cypress
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itentergy texas
HIFLD line ID307942
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Lumberton PV I, LLC Announced Solar 1.2 mi 200
Peri Peri Solar Postponed Solar 8.9 mi 115

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution