Show on map
Hercules - Fort Myers Switchyard 230 kV — Transmission lineData Center — Filed · Large load · FL · 8.1 mi awayLEE HEALTH LAB & DATA CENTER — Under construction · Large load · FL · 8.1 mi away
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hercules - Fort Myers Switchyard 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Florida Power Light

Details

Who’s behind it

Owner
Florida Power Light

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
13
Substations at the ends (as the source names them)
Hercules to Fort Myers Switchyard
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itflorida power light
HIFLD line ID156062
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Data Center Filed Large load 8.1 mi
LEE HEALTH LAB & DATA CENTER Under construction Large load 8.1 mi

Sources FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution