Show on map
Hiawatha - Coffey 161 kV — Transmission lineData Center — Filed · Large load · IA · 10.3 mi awayCedar Rapids Data Center — Filed · Large load · IA · 10.5 mi awayQTS East Data Center - Temporary Crane — Filed · Large load · IA · 11.1 mi awayQTS Data Center — Filed · Large load · IA · 11.2 mi awayCoggon Solar LLC — Under construction · Solar · IA · 100 MW · 11.4 mi awayMobile Cranes (Cedar Rapids data centre) — Filed · Large load · IA · 11.4 mi awaySuffolk/DataCenter/MobileCrane/DC5/Laydown — Filed · Large load · IA · 11.5 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hiawatha - Coffey 161 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
161 kV
States crossed
US-IA
Owner (as stated)
Midamerican Energy

Details

Who’s behind it

Owner
Midamerican Energy

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
10
Substations at the ends (as the source names them)
Hiawatha to Coffey
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itmidamerican energy
HIFLD line ID158098
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Data Center Filed Large load 10.3 mi
Cedar Rapids Data Center Filed Large load 10.5 mi
QTS East Data Center - Temporary Crane Filed Large load 11.1 mi
QTS Data Center Filed Large load 11.2 mi
Coggon Solar LLC Under construction Solar 11.4 mi 100
Mobile Cranes (Cedar Rapids data centre) Filed Large load 11.4 mi
Suffolk/DataCenter/MobileCrane/DC5/Laydown Filed Large load 11.5 mi

Sources FAA OE/AAA · EIA-860M

Sources

  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution