Show on map
Hickory Park Solar Hybrid — Power plant · Solar · RWE Americas, LLCPeach Wood Solar — Announced · Solar · GA · 261 MW · 5.5 mi awayCentaurus Solar - GA — Postponed · Solar · GA · 400 MW · 10.8 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Hickory Park Solar Hybrid

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
431,446 MWh
Grid
230 kV to Georgia Power Co (SOCO)
Location
Mitchell County, Georgia
Operated by
RWE Americas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805456
Location id
L100000804735
Eia plant ids
63522
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
230
Transmission owner
Georgia Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
Fuel burned (MMBtu), 20251,485,841
Capacity factor, 20250.209
Net generation (MWh), 2025431,446
Balancing authority codeSOCO

Solar arrays

Array area (acres)
1,346.8
AC capacity (MW)
195.5
DC capacity (MW)
268.8
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2015

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Peach Wood Solar Announced Solar 5.5 mi 261
Centaurus Solar - GA Postponed Solar 10.8 mi 400

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution