Show on map
Highland Hills - Braunig 138 kV — Transmission linePadua 3 — Under construction · Battery storage · TX · 200 MW · 2.8 mi awayRush ESS — Studied · Battery storage · TX · 201.3 MW · 3.7 mi awayAlamo City ESS — Contracted · Battery storage · TX · 128.2 MW · 4.2 mi awayEl Patrimonio — Contracted · Solar · TX · 152.3 MW · 7.8 mi awayAlamo 3 BESS 2 — Postponed · Battery storage · TX · 100 MW · 10.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Highland Hills - Braunig 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Bandera Electric Coop

Details

Who’s behind it

Owner
Bandera Electric Coop

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
10
Substations at the ends (as the source names them)
Highland Hills to Braunig
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itbandera electric coop
HIFLD line ID309045
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Padua 3 Under construction Battery storage 2.8 mi 200
Rush ESS Studied Battery storage 3.7 mi 201.3
Alamo City ESS Contracted Battery storage 4.2 mi 128.2
El Patrimonio Contracted Solar 7.8 mi 152.3
Alamo 3 BESS 2 Postponed Battery storage 10.6 mi 100

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 28, 2026

Attribution