Show on map
Hopewell Cogeneration NJ — Power plant · Gas, reciprocating engine · Hopewell Campus Owners LLCPROPOSED DATA CENTER DEVELOPMENT — Under construction · Large load · NJ · 9.0 mi awayVicinity Energy Trenton, L.P. — Postponed · Gas, combustion turbine · NJ · 9.2 MW · 9.1 mi awayMCGRAW HILL INC — Built · Large load · NJ · 12.4 mi awayQTS INVESTMENTS PROPERTIES PRINCETON LLC — Built · Large load · NJ · 12.7 mi awayAMAZON DATA SVCS INC PNE100 — Built · Large load · PA · 12.8 mi awayBLOOMBERG DATA CENTER — Built · Large load · NJ · 13.5 mi away
  • Combustion
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Hopewell Cogeneration NJ

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
271 MWh
Grid
69 kV to Public Service Elec & Gas Co (PJM)
Location
Mercer County, New Jersey
Operated by
Hopewell Campus Owners LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025
Fuel burned MMBtu by year, 2016 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
11 years since 2015
Unused energy
35 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,672 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
69
Transmission owner
Public Service Elec & Gas Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20252,892
Capacity factor, 20250.008
Heat rate (Btu/kWh), 202510,671.6
Net generation (MWh), 2025271
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
PROPOSED DATA CENTER DEVELOPMENT Under construction Large load 9.0 mi
Vicinity Energy Trenton, L.P. Postponed Gas, combustion turbine 9.1 mi 9.2
MCGRAW HILL INC Built Large load 12.4 mi
QTS INVESTMENTS PROPERTIES PRINCETON LLC Built Large load 12.7 mi
AMAZON DATA SVCS INC PNE100 Built Large load 12.8 mi
BLOOMBERG DATA CENTER Built Large load 13.5 mi

Sources EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air

Sources

Attribution