Horry Land Fill Gas Site
- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
Horry Land Fill Gas Site: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Horry Land Fill Gas Site
Power plant · Biomass
Key facts
Power plant · Biomassran 12% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2001
- Net generation, 2025
- 4,248 MWh
- Grid
- 12 kV to Horry Electric Coop Inc (SC)
- Location
- Horry County, South Carolina
- Operated by
- South Carolina Public Service AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 4,248
MWh - Fuel burned, 2025
- 49,136
MMBtu - Capacity factor, 2025
- 11.6
% - Heat rate, 2025
- 11,567
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 4,248 | 49,136 | 11.6% | 11,567 |
| 2024 | 4,761 | 55,064 | 12.9% | 11,566 |
| 2023 | 8,441 | 92,413 | 22.9% | 10,948 |
| 2022 | 5,753 | 66,003 | 15.6% | 11,473 |
| 2021 | 2,244 | 29,292 | 6.1% | 13,054 |
| 2020 | 8,094 | 93,477 | 21.9% | 11,549 |
| 2019 | 10,592 | 112,948 | 28.8% | 10,664 |
| 2018 | 8,394 | 100,243 | 22.8% | 11,942 |
| 2017 | 9,371 | 119,566 | 25.5% | 12,759 |
| 2016 | 7,140 | 76,813 | 19.4% | 10,758 |
| 2015 | 7,570 | 125,377 | 20.6% | 16,562 |
| 2014 | 12,764 | 122,925 | 34.7% | 9,631 |
| 2013 | 13,369 | 140,904 | 36.3% | 10,540 |
| 2012 | 14,015 | 146,143 | 38.0% | 10,428 |
| 2011 | 14,827 | 155,470 | 40.3% | 10,486 |
| 2010 | 17,416 | 191,729 | 47.3% | 11,009 |
| 2009 | 14,060 | 150,746 | 38.2% | 10,722 |
| 2008 | 15,090 | 148,866 | 40.9% | 9,865 |
| 2007 | 16,512 | 173,697 | 44.9% | 10,519 |
| 2006 | 20,732 | 227,105 | 56.4% | 10,954 |
| 2005 | 20,822 | 220,340 | 56.6% | 10,582 |
| 2004 | 23,391 | 243,228 | 63.4% | 10,398 |
| 2003 | 22,091 | 232,460 | 60.0% | 10,523 |
| 2002 | 15,522 | 146,532 | 42.2% | 9,440 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.