Show on map
IL University Park 450 Central Ave — Power plant · Solar · Catalyze University Park Central Ave Microgrid, LLCFalconhead Solar, LLC — Under construction · Solar · IL · 5 MW · 6.0 mi awaySteger — Under construction · Solar · IL · 2 MW · 8.9 mi awayW 167th St — Under construction · Solar · IL · 1.5 MW · 11.3 mi awayRobbins Community Power LLC — Postponed · Biomass · IL · 55 MW · 13.8 mi awayIL2 - W109 — Under construction · Solar · IL · 4.9 MW · 14.2 mi awayKA 340 — Under construction · Solar · IL · 5 MW · 14.4 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

IL University Park 450 Central Ave

Power plant · Solar

Key facts

Power plant · Solarran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
183 MWh
Grid
12 kV to Commonwealth Edison Co (PJM)
Location
Will County, Illinois
Operated by
Catalyze University Park Central Ave Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001058398
Location id
L100001050652
Eia plant ids
68538
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
12
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025625
Capacity factor, 20250.009
Net generation (MWh), 2025183
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Falconhead Solar, LLC Under construction Solar 6.0 mi 5
Steger Under construction Solar 8.9 mi 2
W 167th St Under construction Solar 11.3 mi 1.5
Robbins Community Power LLC Postponed Biomass 13.8 mi 55
IL2 - W109 Under construction Solar 14.2 mi 4.9
KA 340 Under construction Solar 14.4 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution