Show on map
International Paper Prattville Mill — Power plant · Biomass · INTERNATIONAL PAPER COE B Harris Electric Generating Plant — Postponed · Gas, combined cycle · AL · 1,230 MW · 6.5 mi awayDOTIER, LLC — Built · Large load · AL · 13.0 mi awayMRY META Project (Montgomery data centre) — Filed · Large load · AL · 13.1 mi awayMML1-2 (Hope Hull data centre) — Filed · Large load · AL · 13.6 mi awaySR Hope Hull — Permitted · Solar · AL · 80 MW · 14.4 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

International Paper Prattville Mill

Power plant · Biomass

Key facts

Power plant · Biomassran 71% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1967
Net generation, 2025
558,924 MWh
Grid
110 kV, 12 kV to Alabama Power Co (SOCO)
Location
Autauga County, Alabama
Operated by
International Paper COSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Owner
International Paper COSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
59 years since 1967
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
International Paper Co
Share pct
100
Gem entity id
E100000001241
Unit ids
G100000201661, G100000201662
Location id
L100000201380
Eia plant ids
52140
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
110, 12
Transmission owner
Alabama Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110011734935
Subparts reported
AA, C, II, TT
NAICS code
322130
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006892
Fuel burned (MMBtu), 202520,284,386
Capacity factor, 20250.711
Net generation (MWh), 2025558,924.2
Balancing authority codeSOCO
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 36291.8 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
E B Harris Electric Generating Plant Postponed Gas, combined cycle 6.5 mi 1,230
DOTIER, LLC Built Large load 13.0 mi
MRY META Project (Montgomery data centre) Filed Large load 13.1 mi
MML1-2 (Hope Hull data centre) Filed Large load 13.6 mi
SR Hope Hull Permitted Solar 14.4 mi 80

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA

Sources

Attribution