Kaheawa Wind Power II LLC
Power plant · Wind
Key facts
Power plant · Windran 18% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 47,902 MWh
- Grid
- 69 kV to Maui Electric Co Ltd
- Location
- Maui County, Hawaii
- Operated by
- Evergreen Wind, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 47,902
MWh - Fuel burned, 2025
- 163,441
MMBtu - Capacity factor, 2025
- 17.6
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 30,997 | 105,762 | — | — |
| 2025 | 47,902 | 163,441 | 17.6% | — |
| 2024 | 55,550 | 189,536 | 20.4% | — |
| 2023 | 41,764 | 142,498 | 15.4% | — |
| 2022 | 60,853 | 207,631 | 22.4% | — |
| 2021 | 58,192 | 514,650 | 21.4% | — |
| 2020 | 51,069 | 447,722 | 18.8% | — |
| 2019 | 63,843 | 568,521 | 23.5% | — |
| 2018 | 64,083 | 583,413 | 23.6% | — |
| 2017 | 66,732 | 614,802 | 24.6% | — |
| 2016 | 80,196 | 740,369 | 29.4% | — |
| 2014 (4 of 12 months) | 17,596 | 167,338 | — | — |
| 2013 | 44,748 | 426,939 | 16.5% | — |
| 2012 (7 of 12 months) | 28,501 | 271,215 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.