Show on map
Kammer - South Canton 765 kV — Transmission lineMoundsville Power — Postponed · Gas, combined cycle · WV · 712.6 MW · 3.0 mi awayPike Island Hydroelectric Project — Filed · Hydro · OH · 20 MW · 5.8 mi awayEchelon Solar — Postponed · Solar + storage · OH · 160 MW · 8.3 mi awayCadiz Power Plant — Postponed · Gas, combined cycle · OH · 1,320 MW · 9.2 mi awaySteubenville Solar — Announced · Solar · OH · 43 MW · 9.6 mi awayNottingham Solar — Under construction · Solar · OH · 100 MW · 11.2 mi awayStark Solar, LLC — Announced · Solar · OH · 150 MW · 14.6 mi away
  • Clean firm
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Kammer - South Canton 765 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
765 kV
States crossed
US-OH, US-WV
Owner (as stated)
Ohio Power

Details

Who’s behind it

Owner
Ohio Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
80
Substations at the ends (as the source names them)
Kammer to South Canton
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itohio power
HIFLD line ID138640
Voltage class735 kV and above

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Moundsville Power Postponed Gas, combined cycle 3.0 mi 712.6
Pike Island Hydroelectric Project Filed Hydro 5.8 mi 20
Echelon Solar Postponed Solar + storage 8.3 mi 160
Cadiz Power Plant Postponed Gas, combined cycle 9.2 mi 1,320
Steubenville Solar Announced Solar 9.6 mi 43
Nottingham Solar Under construction Solar 11.2 mi 100
Stark Solar, LLC Announced Solar 14.6 mi 150

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution