Kinder Morgan Southeast Terminal, Charlotte 2
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
KINDER MORGAN SOUTHEAST TERMINAL, CHARLOTTE 2: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Kinder Morgan Southeast Terminal, Charlotte 2
Petroleum product terminal
As filed: KINDER MORGAN SOUTHEAST TERMINAL, CHARLOTTE 2
Key facts
Petroleum product terminal Operating- Location
- North Carolina
Details
Who’s behind it
- Owner
- Kinder Morgan Southeast TerminalSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Book a call
About these actionsBook a call: our team gets you what you need.
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 1 |
| Site | CHARLOTTE 2 |
| Survey | EIA-815 |
| Owner, as the source states it | KINDER MORGAN SOUTHEAST TERMINAL |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed | Large load | 3.8 mi | |
| CLT16 - Data Center Filed | Large load | 6.9 mi | |
| CLT 16 12MW DATA CENTER Under construction | Large load | 6.9 mi | |
| Allen 2 BESS Announced | Battery storage | 7.2 mi | 167 |
| McDowell Creek Solar LLC Under construction | Solar | 8.0 mi | 2 |
| Hornet Solar Under construction | Solar | 9.1 mi | 73 |
| AREP DATA CENTER Under construction | Large load | 13.6 mi | |
| CLT-150 Building 1 - Crane 1 (Charlotte data centre) Filed | Large load | 13.7 mi |
Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M