Show on map
KINDER MORGAN SOUTHEAST TERMINAL, NORTH AUGUSTA 2 — Petroleum product terminalAIKEN 5 MW DATA CENTER — Under construction · Large load · SC · 6.4 mi awayForeman Solar — Postponed · Solar · SC · 6.4 MW · 11.9 mi away
  • Loads
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Kinder Morgan Southeast Terminal, North Augusta 2

Petroleum product terminal

As filed: KINDER MORGAN SOUTHEAST TERMINAL, NORTH AUGUSTA 2

Key facts

Petroleum product terminal Operating
Location
South Carolina

Details

Who’s behind it

Owner
Kinder Morgan Southeast TerminalSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd1
SiteNORTH AUGUSTA 2
SurveyEIA-815
Owner, as the source states itKINDER MORGAN SOUTHEAST TERMINAL
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AIKEN 5 MW DATA CENTER Under construction Large load 6.4 mi
Foreman Solar Postponed Solar 11.9 mi 6.4

Sources EPA ICIS-NPDES · EIA-860M

Sources

Attribution