Show on map
Libertyville 138 kV line — Transmission lineT5@CHICAGO IV, LP — Built · Large load · IL · 3.8 mi awayT5 CHI IV Data Center Buildings — Filed · Large load · IL · 3.9 mi awayIL - Renewable Properties - Bobcat - Wes — Under construction · Solar · IL · 4.5 MW · 10.5 mi awayNL IL Lake — Under construction · Solar · IL · 5 MW · 11.3 mi awayZion Energy Center — Postponed · Gas, combustion turbine · IL · 397.8 MW · 12.0 mi awayCenergy IL - Zion Park District — Under construction · Solar · IL · 2.3 MW · 12.2 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Libertyville 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IL
Owner (as stated)
Commonwealth Edison

Details

Who’s behind it

Owner
Commonwealth Edison

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
0
Substations at the ends (as the source names them)
Libertyville
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcommonwealth edison
HIFLD line ID113124
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
T5@CHICAGO IV, LP Built Large load 3.8 mi
T5 CHI IV Data Center Buildings Filed Large load 3.9 mi
IL - Renewable Properties - Bobcat - Wes Under construction Solar 10.5 mi 4.5
NL IL Lake Under construction Solar 11.3 mi 5
Zion Energy Center Postponed Gas, combustion turbine 12.0 mi 397.8
Cenergy IL - Zion Park District Under construction Solar 12.2 mi 2.3

Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M

Sources

Attribution