Libertyville 345 kV line — Transmission lineNL IL Lake — Under construction · Solar · IL · 5 MW · 0.4 mi awayZion Energy Center — Postponed · Gas, combustion turbine · IL · 397.8 MW · 0.7 mi awayIL - Renewable Properties - Bobcat - Wes — Under construction · Solar · IL · 4.5 MW · 1.6 mi awayCenergy IL - Zion Park District — Under construction · Solar · IL · 2.3 MW · 2.5 mi awayT5@CHICAGO IV, LP — Built · Large load · IL · 3.9 mi awayT5 CHI IV Data Center Buildings — Filed · Large load · IL · 3.9 mi awayRed Oak Ridge Energy Center LLC — Studied · Gas, other · WI · 1,211.2 MW · 11.8 mi away2250 (Racine data centre) — Filed · Large load · WI · 14.0 mi awayMICROSOFT CORPORATION - MKE 3B DATA CENTER — Built · Large load · WI · 14.3 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Libertyville 345 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-IL
Owner (as stated)
Commonwealth Edison

Details

Who’s behind it

Owner
Commonwealth Edison

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
12
Substations at the ends (as the source names them)
Libertyville
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcommonwealth edison
HIFLD line ID133937
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NL IL Lake Under construction Solar 0.4 mi 5
Zion Energy Center Postponed Gas, combustion turbine 0.7 mi 397.8
IL - Renewable Properties - Bobcat - Wes Under construction Solar 1.6 mi 4.5
Cenergy IL - Zion Park District Under construction Solar 2.5 mi 2.3
T5@CHICAGO IV, LP Built Large load 3.9 mi
T5 CHI IV Data Center Buildings Filed Large load 3.9 mi
Red Oak Ridge Energy Center LLC Studied Gas, other 11.8 mi 1,211.2
2250 (Racine data centre) Filed Large load 14.0 mi
MICROSOFT CORPORATION - MKE 3B DATA CENTER Built Large load 14.3 mi

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · Berkeley Lab

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution