Los Banos - Moss Landing 500 kV — Transmission lineCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 1.5 mi awayCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 4.0 mi awayStellar Wright BESS — Under construction · Storage · CA · 84.8 MW · 4.3 mi awayMarina Landfill Gas — Announced · Biomass · CA · 6.4 MW · 4.8 mi awayGonzaga Ridge Wind Farm — Under construction · Wind · CA · 34.6 MW · 5.4 mi awayGonzaga Ridge Wind Farm — Under construction · Wind · CA · 40.3 MW · 5.4 mi awayGonzaga Ridge Wind Farm — Under construction · Wind · CA · 57.9 MW · 5.4 mi awayGonzaga Ridge Battery Facility — Under construction · Storage · CA · 51.8 MW · 7.9 mi awayMerced BESS — Under construction · Storage · CA · 3 MW · 9.1 mi awayGilroy Data Center - Temp Crane — Filed · Large load · CA · 14.1 mi awayRenz Energy Storage — Postponed · Storage · CA · 20 MW · 14.3 mi awayAWS DATA CENTER GILROY - SFO069 — Large load · CA · 14.8 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Los Banos - Moss Landing 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
52
Substations at the ends (as the source names them)
Los Banos to Moss Landing
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID305874
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crazy Horse Solar Project Postponed Solar 1.5 mi 2
CA Moss Landing 3040 Hilltop Rd Postponed Solar + storage 4.0 mi 2.2
Stellar Wright BESS Under construction Storage 4.3 mi 84.8
Marina Landfill Gas Announced Biomass 4.8 mi 6.4
Gonzaga Ridge Wind Farm × 3 units Under construction Wind 5.4 mi 132.8
Gonzaga Ridge Battery Facility Under construction Storage 7.9 mi 51.8
Merced BESS Under construction Storage 9.1 mi 3
Gilroy Data Center - Temp Crane Filed Large load 14.1 mi
Renz Energy Storage Postponed Storage 14.3 mi 20
AWS DATA CENTER GILROY - SFO069 Unknown Large load 14.8 mi

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution