Lowell Cogeneration Company LP
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 1% of 2012 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1988
- Net generation, 2012
- 2,735 MWh
- Location
- Middlesex County, Massachusetts
- Operated by
- Lowell Cogeneration CO, LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- Lowell Cogeneration CO, LPSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 38 years since 1988
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2013
- Capacity retired
- 33.5 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combined Cycle | 25 MW | Retired | September 2013 |
| GEN2 | Natural Gas Fired Combined Cycle | 8.5 MW | Retired | September 2013 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- ISNE
Transmission lines within 15 mi (10)
- Sandy Pond - Tewksbury No A 345 kV
- Litchfield - Tewksbury Substation 230 kV
- Tewksbury No A 345 kV line
- Woburn - Tewksbury No A 345 kV
- West Methuen 115 kV line
- Wakefield Junction - Tewksbury No A 345 kV
- Sandy Pond - Lawrence Road 345 kV
- West Andover 115 kV line
- West Andover 115 kV line
- Westford 115 kV line
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2 scheduled to retire, 33.5 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| MARKLEY LOWELL Built | Large load | 1.1 mi | |
| ROBERT HOOKE HOLDINGS, LLC Built | Large load | 10.5 mi | |
| AMAZON COM SERVICES LLC DTB9 Built | Large load | 14.4 mi |
Sources EPA ICIS-Air · EPA ICIS-NPDES