Show on map
Majestic - Tompkins 345 kV — Transmission lineGrand Basin Energy Storage — Under construction · Storage · MI · 100 MW · 0.3 mi awayJackson County Solar, LLC — Under construction · Solar · MI · 125 MW · 12.7 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Majestic - Tompkins 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-MI
Owner (as stated)
Consumers Energy

Details

Who’s behind it

Owner
Consumers Energy

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
28
Substations at the ends (as the source names them)
Majestic to Tompkins
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itconsumers energy
HIFLD line ID134024
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Grand Basin Energy Storage Under construction Storage 0.3 mi 100
Jackson County Solar, LLC Under construction Solar 12.7 mi 125

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution