Show on map
Marlton - Silver Lake 230 kV — Transmission linePettinos Solar — Postponed · Solar · NJ · 1.2 MW · 3.5 mi awayDeptford Solar One — Postponed · Solar · NJ · 3 MW · 9.4 mi awayNJ - CS Energy - Tabernacle Sands Solar — Under construction · Solar · NJ · 3 MW · 11.9 mi awayEQUINIX — Large load · PA · 12.8 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 12.8 mi away365 DATA CENTERS — Built · Large load · PA · 12.9 mi awayH5 DATA CENTERS — Built · Large load · PA · 12.9 mi away
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Marlton - Silver Lake 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NJ

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
8
Substations at the ends (as the source names them)
Marlton to Silver Lake
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID110223
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pettinos Solar Postponed Solar 3.5 mi 1.2
Deptford Solar One Postponed Solar 9.4 mi 3
NJ - CS Energy - Tabernacle Sands Solar Under construction Solar 11.9 mi 3
EQUINIX Unknown Large load 12.8 mi
CROSS CONNECT SOLUTIONS Built Large load 12.8 mi
365 DATA CENTERS Built Large load 12.9 mi
H5 DATA CENTERS Built Large load 12.9 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution