Show on map
Marshall Steam Station 230 kV line — Transmission lineAustin Solar — Postponed · Solar · NC · 2 MW · 9.4 mi awayAREP DATA CENTER — Under construction · Large load · NC · 9.7 mi awayBear Poplar Solar — Postponed · Solar · NC · 5 MW · 10.8 mi awayRowan Solar NC LLC — Postponed · Solar · NC · 2 MW · 12.1 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 12.2 mi awayMaiden Creek Battery — Under construction · Storage · NC · 50 MW · 12.4 mi awayRJ Solar — Postponed · Solar · NC · 5 MW · 14.2 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 14.7 mi awayMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 14.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Marshall Steam Station 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
24
Substations at the ends (as the source names them)
Marshall Steam Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID111885
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Austin Solar Postponed Solar 9.4 mi 2
AREP DATA CENTER Under construction Large load 9.7 mi
Bear Poplar Solar Postponed Solar 10.8 mi 5
Rowan Solar NC LLC Postponed Solar 12.1 mi 2
McDowell Creek Solar LLC Under construction Solar 12.2 mi 2
Maiden Creek Battery Under construction Storage 12.4 mi 50
RJ Solar Postponed Solar 14.2 mi 5
Hornet Solar Under construction Solar 14.7 mi 73
MICROSOFT CORPORATION, CLT10 Built Large load 14.8 mi

Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air

Sources

Attribution