Show on map
Martins Creek - Gilbert 230 kV — Transmission lineWarren County Solar — Postponed · Solar · NJ · 3 MW · 0.2 mi awayPPL Glendon LFGTE Plant — Postponed · Biomass · PA · 1.6 MW · 4.4 mi awayTIERPOINT PENNSYLVANIA TWO LLC — Built · Large load · PA · 11.5 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Martins Creek - Gilbert 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NJ, US-PA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
19
Substations at the ends (as the source names them)
Martins Creek to Gilbert
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID144543
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Warren County Solar Postponed Solar 0.2 mi 3
PPL Glendon LFGTE Plant Postponed Biomass 4.4 mi 1.6
TIERPOINT PENNSYLVANIA TWO LLC Built Large load 11.5 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution