Show on map
Mary Ann Gas Plant — Power plant · Gas, steam turbine · Mobil Explrtn & Prodg SE IncFoley Solar, LLC — Under construction · Solar · AL · 80 MW · 6.6 mi away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Mary Ann Gas Plant

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1990
Net generation, 2010
0 MWh
Location
Mobile County, Alabama
Operated by
Mobil Explrtn & Prodg SE IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2010
Fuel burned MMBtu by year, 2001 to 2010
  • Gas
  • Unspecified fuel

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Book a call About these actionsWatch: follow it in your Deal room and on the map. Add to Deal room: start your private project from it. Book a call: our team gets you what you need.

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
36 years since 1990

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2010
Capacity retired
2.3 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
6202Natural Gas Steam Turbine2.3 MWRetiredDecember 2010

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 6202 scheduled to retire, 2.3 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Foley Solar, LLC Under construction Solar 6.6 mi 80

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution