Show on map
Mcguire - Harrisburg 230 kV — Transmission lineCLT-150 Building 1 - Crane 1 (Charlotte data centre) — Filed · Large load · NC · 0.4 mi awayAREP DATA CENTER — Under construction · Large load · NC · 0.5 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 1.7 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 5.2 mi awayCLT 16 12MW DATA CENTER — Under construction · Large load · NC · 10.2 mi awayCLT16 - Data Center — Filed · Large load · NC · 10.3 mi awayDLR Moores Chapel Mobile Crane (Charlotte data centre) — Filed · Large load · NC · 11.6 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Mcguire - Harrisburg 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
19
Substations at the ends (as the source names them)
Mcguire to Harrisburg
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID113357
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CLT-150 Building 1 - Crane 1 (Charlotte data centre) Filed Large load 0.4 mi
AREP DATA CENTER Under construction Large load 0.5 mi
McDowell Creek Solar LLC Under construction Solar 1.7 mi 2
Hornet Solar Under construction Solar 5.2 mi 73
CLT 16 12MW DATA CENTER Under construction Large load 10.2 mi
CLT16 - Data Center Filed Large load 10.3 mi
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 11.6 mi

Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M

Sources

Attribution