McKinley Paper Co. - Washington Mill
Power plant · Biomass
Key facts
Power plant · Biomass Out of service- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- 0 MWh
- Grid
- 69 kV to Bonneville Power Administration (BPAT)
- Location
- Clallam County, Washington
- Operated by
- McKinley Paper Co. - Washington MillSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Biomass source: “Wood/Wood Waste Biomass”
- Age
- 4 years since 2022
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | BPAT |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
- Capacity retired
- 20 MW
- Generators retired
- 1
- Capacity still in service
- 12.6 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| G-11 | Wood/Wood Waste Biomass | 20 MW | Retired | April 2017 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- Bonneville Power Administration
- Balancing authority
- Bonneville Power Administration
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- In service · EIA-860M
- Stated Unit G-11 scheduled to retire, 20 MW · EIA-860M
Sources
4 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory