Mckinley - Waynedale 138 kV — Transmission lineProject Mustang ADC4 LR11000 (Fort Wayne data centre) — Filed · Large load · IN · 6.5 mi awayADC2A (Fort Wayne data centre) — Filed · Large load · IN · 6.6 mi away
  • Loads
  • In development
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Mckinley - Waynedale 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IN
Owner (as stated)
Indiana Michigan Power

Details

Who’s behind it

Owner
Indiana Michigan Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
3
Substations at the ends (as the source names them)
Mckinley to Waynedale
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itindiana michigan power
HIFLD line ID119897
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Project Mustang ADC4 LR11000 (Fort Wayne data centre) Filed Large load 6.5 mi
ADC2A (Fort Wayne data centre) Filed Large load 6.6 mi