MillerCoors Trenton Brewery

Power plant · Coal

Key facts

Power plant · Coal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1992
Location
Butler County, Ohio
Operated by
MillerCoors LLC Trenton BrewerySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Coal source: “Conventional Steam Coal”
Age
34 years since 1992
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2013
Capacity retired
21.8 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEConventional Steam Coal13.8 MWRetiredOctober 2013
MURRConventional Steam Coal8 MWRetiredOctober 2013

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GE, MURR scheduled to retire, 21.8 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Trenton Solar - (OH) Under construction Solar 0.5 mi 9.5
CYRUSONE LLC - LEBANON DATA CENTER Built Large load 14.7 mi

Sources EIA-860M · EPA ICIS-Air