Show on map
Mira Loma Energy Storage Facility — Power plant · Battery storage · Southern California Edison CoRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 0.5 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 2.5 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 2.5 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 2.6 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 4.8 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 5.1 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 5.3 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 5.4 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 5.6 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 5.7 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 5.7 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 5.9 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 6.1 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 8.7 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 10.3 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 11.0 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 11.0 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 11.7 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 11.7 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Mira Loma Energy Storage Facility

Power plant · Battery storage

Key facts

Power plant · Battery storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2025
-2,370 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California
Operated by
Southern California Edison CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Battery storage source: “Batteries”
Age
10 years since 2016
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-2,370
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -2370.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Roadhouse Energy Center Contracted Storage 0.5 mi 300
Solar Photovoltaic Project #08 Postponed Solar 2.5 mi 0.5
Solar Photovoltaic Project #12 Postponed Solar 2.5 mi 0.5
Solar Photovoltaic Project #09 Postponed Solar 2.6 mi 0.5
Solar Photovoltaic Project #21 Postponed Solar 4.8 mi 2.5
Solar Photovoltaic Project #04 Postponed Solar 5.1 mi 1.5
Solar Photovoltaic Project #14 Postponed Solar 5.3 mi 1.5
Solar Photovoltaic Project #10 Postponed Solar 5.4 mi 0.5
Solar Photovoltaic Project #31 Postponed Solar 5.6 mi 1
Solar Photovoltaic Project #23 Postponed Solar 5.7 mi 0.5
Solar Photovoltaic Project #17 Postponed Solar 5.7 mi 0.5
Solar Photovoltaic Project #18 Postponed Solar 5.9 mi 0.5
Solar Photovoltaic Project #19 Postponed Solar 6.1 mi 5
Solar Photovoltaic Project #30 Postponed Solar 8.7 mi 1.5
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 10.3 mi 4
Solar Photovoltaic Project #24 Postponed Solar 11.0 mi 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 11.0 mi 3
Solar Photovoltaic Project #25 Postponed Solar 11.7 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 11.7 mi 1

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 29, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution