MMSD Jones Island Wastewater — Power plant · Gas, combustion turbine · Milwaukee Metro Sewerage DistCity of Milwaukee- Airport Expansion — Under construction · Solar · WI · 4.6 MW · 6.3 mi awaySouth Oak Creek — Filed · Gas, combustion turbine · WI · 1,181.5 MW · 12.7 mi awayRoot River Solar WI, LLC — Filed · Solar · WI · 6 MW · 14.1 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

MMSD Jones Island Wastewater

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 29% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1971
Net generation, 2025
79,791 MWh
Grid
26 kV to Wisconsin Electric Power Co (MISO)
Location
Milwaukee County, Wisconsin

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
55 years since 1971
Unused energy
194 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,896 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110013962514
Subparts reported
C
NAICS code
221320
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003426
Fuel burned (MMBtu), 2025869,438
Capacity factor, 20250.291
Heat rate (Btu/kWh), 202510,896.4
Net generation (MWh), 202579,791
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
17.5 MW
Generators retired
1
Capacity still in service
31.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN2Natural Gas Fired Combustion Turbine17.5 MWRetiredJuly 2013

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
26 kV
Transmission or distribution system owner
Wisconsin Electric Power Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MILWAUKEE METROPOLITAN SEWERAGE DISTRICT Owner 100.0% Dec 31, 2023 EPA GHGRP
Milwaukee Metro Sewerage Dist Operator EIA-860M

Timeline

  • Stated Unit GEN2 scheduled to retire, 17.5 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
City of Milwaukee- Airport Expansion Under construction Solar 6.3 mi 4.6
South Oak Creek Filed Gas, combustion turbine 12.7 mi 1,181.5
Root River Solar WI, LLC Filed Solar 14.1 mi 6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution