Show on map
Moss Landing - Green Valley 115 kV — Transmission lineCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 3.0 mi awayMarina Landfill Gas — Announced · Biomass · CA · 6.4 MW · 6.1 mi awayCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 6.5 mi awayRenz Energy Storage — Postponed · Storage · CA · 20 MW · 10.5 mi awayAWS DATA CENTER GILROY - SFO069 — Large load · CA · 10.7 mi awayGilroy Data Center - Temp Crane — Filed · Large load · CA · 11.0 mi away
  • Bioenergy
  • Loads
  • In development
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Moss Landing - Green Valley 115 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
14
Substations at the ends (as the source names them)
Moss Landing to Green Valley
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID302252
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CA Moss Landing 3040 Hilltop Rd Postponed Solar + storage 3.0 mi 2.2
Marina Landfill Gas Announced Biomass 6.1 mi 6.4
Crazy Horse Solar Project Postponed Solar 6.5 mi 2
Renz Energy Storage Postponed Storage 10.5 mi 20
AWS DATA CENTER GILROY - SFO069 Unknown Large load 10.7 mi
Gilroy Data Center - Temp Crane Filed Large load 11.0 mi

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution