Show on map
- Combustion
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- In development
- Under construction
- Other infrastructure
MOTIVA ENTERPRISES LLC, PASADENA BLENDING TERMINAL: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Motiva Enterprises LLC, Pasadena Blending Terminal
Petroleum product terminal
As filed: MOTIVA ENTERPRISES LLC, PASADENA BLENDING TERMINAL
Key facts
Petroleum product terminal Operating- Location
- Texas
Details
Who’s behind it
- Owner
- Motiva Enterprises LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 3 |
| Site | PASADENA BLENDING TERMINAL |
| Survey | EIA-815 |
| Owner, as the source states it | MOTIVA ENTERPRISES LLC |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Texas Petrochemicals Postponed | Gas, combined cycle | 2.0 mi | 560 |
| Greens Bayou 6 Under construction | Gas, combustion turbine | 7.5 mi | 445 |
| TX Houston 7080 Express Lane Postponed | Storage | 7.9 mi | 1.5 |
| TX LaPort 10060 Porter Road Solar Postponed | Solar | 9.1 mi | 1.6 |
| NET Power La Porte Station Studied | Gas, combustion turbine | 11.2 mi | 25.5 |
| CPV Pondera King Energy Center Postponed | Gas, combined cycle | 13.6 mi | 900 |
| Pamela Heights I Energy Center Under construction | Storage | 14.3 mi | 101.7 |
| Callisto II Energy Center Under construction | Storage | 14.3 mi | 303.2 |