Show on map
MOTIVA ENTERPRISES LLC, PASADENA BLENDING TERMINAL — Petroleum product terminalTexas Petrochemicals — Postponed · Gas, combined cycle · TX · 560 MW · 2.0 mi awayGreens Bayou 6 — Under construction · Gas, combustion turbine · TX · 445 MW · 7.5 mi awayTX Houston 7080 Express Lane — Postponed · Storage · TX · 1.5 MW · 7.9 mi awayTX LaPort 10060 Porter Road Solar — Postponed · Solar · TX · 1.6 MW · 9.1 mi awayNET Power La Porte Station — Studied · Gas, combustion turbine · TX · 25.5 MW · 11.2 mi awayCPV Pondera King Energy Center — Postponed · Gas, combined cycle · TX · 900 MW · 13.6 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 14.3 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 14.3 mi away
  • Combustion
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Motiva Enterprises LLC, Pasadena Blending Terminal

Petroleum product terminal

As filed: MOTIVA ENTERPRISES LLC, PASADENA BLENDING TERMINAL

Key facts

Petroleum product terminal Operating
Location
Texas

Details

Who’s behind it

Owner
Motiva Enterprises LLCSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd3
SitePASADENA BLENDING TERMINAL
SurveyEIA-815
Owner, as the source states itMOTIVA ENTERPRISES LLC
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Texas Petrochemicals Postponed Gas, combined cycle 2.0 mi 560
Greens Bayou 6 Under construction Gas, combustion turbine 7.5 mi 445
TX Houston 7080 Express Lane Postponed Storage 7.9 mi 1.5
TX LaPort 10060 Porter Road Solar Postponed Solar 9.1 mi 1.6
NET Power La Porte Station Studied Gas, combustion turbine 11.2 mi 25.5
CPV Pondera King Energy Center Postponed Gas, combined cycle 13.6 mi 900
Pamela Heights I Energy Center Under construction Storage 14.3 mi 101.7
Callisto II Energy Center Under construction Storage 14.3 mi 303.2

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution