Mountain Home Energy Center — Power plant · Oil · Energy Systems Group LLC
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Mountain Home Energy Center

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2023 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2023
2 MWh
Grid
15 kV to Tennessee Valley Authority (TVA)
Location
Washington County, Tennessee

Output

Net generation MWh by year, 2014 to 2024
Fuel burned MMBtu by year, 2014 to 2024
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Oil source: “Petroleum Liquids”
Age
24 years since 2002
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
3.60
Units
2
Standby mw
3.60
Status rule
majority_mw_standby
In service mw
3.60
Out of service mw
0
Balancing authority codeTVA

Retirement

Capacity retired
3.2 MW
Generators retired
1
Capacity still in service
3.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Internal Combustion Engine3.2 MWRetiredMay 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
15 kV
Transmission or distribution system owner
Tennessee Valley Authority
Balancing authority
Tennessee Valley Authority
NERC region
SERC
Transmission lines within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Computershare Trust Company, N.A. Owner 100.0% Dec 31, 2025 EIA-860
Energy Systems Group LLC Operator EIA-860M

Timeline

  • Stated Unit GEN1 scheduled to retire, 3.2 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory