MTSU Power Co-Gen Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 86% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1997
Net generation, 2025
37,478 MWh
Grid
12 kV to City of Murfreesboro (TVA)
Location
Rutherford County, Tennessee
Operated by
Middle Tennessee State UniversitySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2026
Fuel burned MMBtu by year, 2012 to 2026
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Middle Tennessee State UniversitySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
29 years since 1997
Unused energy
6 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,459 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110002441288
Subparts reported
C
NAICS code
611310
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1004834
Fuel burned (MMBtu), 2025616,859
Capacity factor, 20250.856
Heat rate (Btu/kWh), 202516,459.2
Net generation (MWh), 202537,478
Balancing authority codeTVA

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
10 MW
Generators retired
5
Capacity still in service
5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
SG-01Petroleum Liquids2 MWRetiredNovember 2016
SG-02Petroleum Liquids2 MWRetiredNovember 2016
SG-03Petroleum Liquids2 MWRetiredNovember 2016
SG-04Petroleum Liquids2 MWRetiredNovember 2016
SG-05Petroleum Liquids2 MWRetiredNovember 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
City of Murfreesboro
Balancing authority
Tennessee Valley Authority
NERC region
SERC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units SG-01, SG-02, SG-03, SG-04, SG-05 scheduled to retire, 10 MW · EIA-860M
  • In service · EIA-860M