- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Naval Submarine Base Kings Bay: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Naval Submarine Base Kings Bay
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1984
- Net generation, 2025
- 362 MWh
- Grid
- 230 kV to Georgia Transmission Corp (SOCO)
- Location
- Camden County, Georgia
- Operated by
- Kings Bay Naval BaseSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 362
MWh - Fuel burned, 2025
- 3,762
MMBtu - Capacity factor, 2025
- 0.1
% - Heat rate, 2025
- 10,406
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 227 | 2,618 | — | 11,533 |
| 2025 | 362 | 3,762 | 0.1% | 10,406 |
| 2024 | 1,012 | 6,804 | 0.4% | 6,722 |
| 2023 | 403 | 4,254 | 0.1% | 10,544 |
| 2022 | 4,039 | 32,081 | 1.5% | 7,942 |
| 2021 (11 of 12 months) | 711 | 15,338 | — | 21,562 |
| 2020 | 820 | 9,571 | 0.3% | 11,672 |
| 2019 (11 of 12 months) | 2,900 | 27,325 | — | 9,422 |
| 2018 | 4,375 | 37,886 | 1.7% | 8,660 |
| 2017 (11 of 12 months) | 2,107 | 19,156 | — | 9,092 |
| 2016 | 1,496 | 14,482 | 0.6% | 9,680 |
| 2015 | 2,862 | 20,725 | 1.1% | 7,241 |
| 2014 | 2,447 | 11,664 | 0.9% | — |
| 2013 | 1,200 | 8,034 | 0.5% | 6,695 |
| 2012 | 1,217 | 13,323 | 0.5% | 10,947 |
| 2011 | 1,205 | 8,032 | 0.5% | 6,666 |
| 2010 | 2,247 | 16,008 | 0.9% | 7,124 |
| 2009 | 2,846 | 15,308 | 1.1% | 5,379 |
| 2008 | 1,534 | 14,499 | 0.6% | 9,452 |
| 2007 | 3,789 | 36,809 | 1.4% | 9,715 |
| 2006 | 1,871 | 18,138 | 0.7% | 9,694 |
| 2005 | 8,909 | 86,503 | 3.4% | 9,710 |
| 2004 | 2,770 | 24,658 | 1.1% | 8,902 |
| 2003 | 2,240 | 19,881 | 0.9% | 8,875 |
| 2002 | 1,664 | 14,791 | 0.6% | 8,889 |
| 2001 | 1,080 | 9,598 | 0.4% | 8,887 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.