Show on map
NCS at Bedok South Road solar project — Power plant · SolarPasir Gudang (TNB) power station GT — Announced · Gas, combustion turbine · Malaysia · 750 MW · 15.0 km awayJurong Island CC power station 1 — Announced · Gas, combined cycle · Singapore · 670 MW · 23.1 km awayPulau Seraya power station H2 CC — Under construction · Gas, combined cycle · Singapore · 600 MW · 23.1 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • Approximate location
  • 10 · 100 · 1,000 MW

NCS at Bedok South Road solar project

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Commissioned
2020
Location
Singapore

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “utility-scale solar / PV”
Age
6 years since 2020
Units
1
1 attribute from Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Attributes
AttributeValue
Gem
Unit ids
G100000834826
Location id
L100000830934
Unit statuses
Operating
1
Location accuracy
approximate

Timeline

  • In service · GEM

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Pasir Gudang (TNB) power station GT Announced Gas, combustion turbine 15.0 km 750
Jurong Island CC power station 1 Announced Gas, combined cycle 23.1 km 670
Pulau Seraya power station H2 CC Under construction Gas, combined cycle 23.1 km 600

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution