New Carlisle - Bosserman 138 kV — Transmission lineChampion Solar I — Postponed · Solar · IN · 51.9 MW · 0.0 mi awaySt Joseph Energy Center — Postponed · Gas, combined cycle · IN · 1,406 MW · 2.2 mi awayAMAZON DATA SERVICES INCORPORATED — Built · Large load · IN · 2.8 mi awayLAVENDER FIELDS HOLDINGS LLC — Built · Large load · IN · 4.3 mi awayCrawler Crane (Michigan City data centre) — Filed · Large load · IN · 4.5 mi awayLPO DC CAMPUS — Under construction · Large load · IN · 9.2 mi away
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

New Carlisle - Bosserman 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IN
Owner (as stated)
Indiana Michigan Power

Details

Who’s behind it

Owner
Indiana Michigan Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
13
Substations at the ends (as the source names them)
New Carlisle to Bosserman
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itindiana michigan power
HIFLD line ID163134
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Champion Solar I Postponed Solar 0.0 mi 51.9
St Joseph Energy Center Postponed Gas, combined cycle 2.2 mi 1,406
AMAZON DATA SERVICES INCORPORATED Built Large load 2.8 mi
LAVENDER FIELDS HOLDINGS LLC Built Large load 4.3 mi
Crawler Crane (Michigan City data centre) Filed Large load 4.5 mi
LPO DC CAMPUS Under construction Large load 9.2 mi

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES