Newington Energy Center: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Newington Energy Center
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 36% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2002
- Net generation, 2025
- 1,913,569 MWh
- Grid
- 345 kV to Public Service Co of NH (ISNE)
- Location
- Rockingham County, New Hampshire
- Operated by
- Essential Power Operating Services LLC
Output
- Gas
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 24 years since 2002
- Unused energy
- 3,390 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,386 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 14,134,664 |
| Capacity factor, 2025 | 0.361 |
| Heat rate (Btu/kWh), 2025 | 7,386.5 |
| Net generation (MWh), 2025 | 1,913,569.0 |
| Balancing authority code | ISNE |
Ownership
3 companies3| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| ESSENTIAL POWER LLC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Essential Power Operating Company, LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
| Essential Power Operating Services LLC | Operator | EIA-860M |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| LIBERTY MUTUAL DATA CENTER Built | Large load | 3.0 mi |
Sources EPA ICIS-Air